patching...
Welcome back, Patch Blogger!

Snapshot: Finishing Touches on Alley 4 Downtown

The newly repaved alley cuts through Acorn Alley and connects South Water Street to South DePeyster Street

 
0 of 0
Alley 4 Face Lift
Workers put the finishing touches on the Alley 4 resurfacing this morning, Aug. 23, 2011.
Photos (3)

Photos

Workers put the finishing touches on the newly resurfaced Alley 4 this morning in downtown Kent.

The $1 million project replaced standard pavement with stamped concrete, and it also marked and widened the pedestrian lanes on both sides of the alley.

Related Topics: Alley 4

Leave a comment